Topics getting the most attention in Montebello public meetings, ranked by how frequently they come up.

10 issues (filtered)16 topics
HighRoads

Street repaving and rehabilitation projects

Consent items put $640,000 of SB1 gas-tax money into rubberized asphalt street resurfacing and $287,354 into emergency-vehicle signal preemption (Opticom GPS).

5 mentions (2 this month)Last discussed Oct 28, 2026
HighRoads

Whittier Boulevard paving project

The main Paving the Way project will resurface Whittier Boulevard end to end, starting around November and finishing by June 2027, with outreach to businesses to keep access open during construction.

1 mention (1 this month)Last discussed Oct 14, 2026
HighRoads

Preferential Parking on W. Victoria Avenue

Residents of W. Victoria Avenue say overflow parking from nearby apartments, Wilcox Elementary, and a gym leaves them unable to park at home, with trash, vandalism, and hit-and-runs in the mix. The commission recommended a permit-parking district; the City Council makes the final call.

2 mentions (1 this month)Last discussed Oct 14, 2026
HighRoads

Bus Stop Improvement Project cancelled over $9.6M deficit

The citywide bus stop upgrade project — new shelters, benches, ADA improvements at up to 100 stops — was cancelled because the construction estimate hit $12.3 million against a $2.7 million budget. Staff plans a peer review of the numbers and will hunt for grants before bringing back a reworked version. Nothing gets built for now.

1 mentionLast discussed Aug 26, 2026
HighRoads

Montebello Bus Lines Fleet Modernization and Wayfinding

The council accepted $2.3 million in federal grants for bus tire leases and preventive maintenance, and moved to apply for a hydrogen fueling infrastructure grant. This keeps Montebello Bus Lines running and moving toward cleaner fuel.

4 mentionsLast discussed Aug 12, 2026
HighRoads

Montebello Boulevard Center Divider Impacts on Businesses

Business owners say the new center divider is killing business — no left turns, red-painted curbs, and multiple crashes in a month. They want it ripped out or fixed.

6 mentionsLast discussed Jun 24, 2026
HighRoads

Olympic Boulevard Complete Streets Project

A big redesign of Olympic from Ford Street toward Garfield: bike lanes, bulb-outs, sidewalks, and lit crosswalks — largely paid for with state and federal safety grants.

1 mentionLast discussed Jun 23, 2026
HighRoads

Whittier Boulevard pedestrian crossing safety

Eleven uncontrolled crossings on one of the city's busiest corridors were studied. Seven dangerous ones will be removed, new signals will go in at 18th Street and Greenwood, and a flashing beacon will be installed at Third Street.

1 mentionLast discussed Jun 23, 2026
HighRoads

Montebello Boulevard Center Divider and Business Access

A business owner says the center divider installed during construction has cut her business by more than 50%, forced fire trucks to drive on the wrong side of the street nine times in three weeks, and caused crashes near the March exit. She's asking the council to remove a 20-25 foot section.

8 mentionsLast discussed Jun 10, 2026
HighRoads

Eastside Light Rail Extension comes to Montebello

Metro's nine-mile rail extension will include a Montebello station at Greenwood and Washington, with service targeted for 2035-2037. The city faces a 3% local match of an unknown amount, and residents can comment on the environmental document through June 26.

1 mentionLast discussed May 27, 2026